Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 1,067 decisions within 5 km, 3 exact-site or onsite candidate records, and 75 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
75 structured nearby appeal records.
75 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For a period of 10 years for the erection of a Portakabin site office of 83.68 sqm. gross floor area and use of the land as open storage of Portakabin buildings placed up to two units high on the northern half of the site only and extending up to 7.48 m above ground level together with all ancillary development. Access is to be by way of a new access from the estate road serving Deerpark Industrial Estate. Utilities and Services to be brought to the site office in the south eastern corner of the site. The compound will be secured by way of a 2.4 m high galvanized paladin fence. Gross floor space of proposed works: 83.68 sqm
For the provision of a Warehouse Unit to include for ancillary office space, ancillary customer collection area and associated signage. The overall development to include for car parking, service yard, a new access roadway from the existing Deerpark Estate Roadway (L81081) and connection to all associated services. Gross floor space of proposed works: 3761.71 sqm
For the provision of a Warehouse Unit to include for ancillary office space, ancillary customer collection area and associated signage. The overall development to include for car parking, service yard, a new access roadway from the existing Deerpark Estate Roadway (L81081) and connection to all associated services. Gross floor space of proposed works: 3761.71 sqm
To office block to front of warehouse. Gross floor space of works to be retained 230.50 sqm
For existing signage will include 1 No. internally illuminated wall sign, 1 No. non-illuminated wall sign, 1 No. non-illuminated freestanding sign and 1 No. internally illuminated freestanding sign.
For 5 No Padel courts, changing rooms/sanitary facilities, managers office, car and bicycle parking and new centrally located site access and associated services. Gross floor space of proposed works: 1052 sqm
The brief summarizes the pattern across all 1,067 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181598The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief