Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
35% of nearby decided applications were refused. The site check found 34 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Chun teach nua agus córas searachais a thógáil. Spás urláir comhlán na n-oibreacha beartaithe: 251 sqm
For a new dwelling house, sewage treatment plant and percolation area along with all ancillary works
For the erection of a 12m telecommunications structure with 2no. receiving dish, dual bay cabinet, concrete post and chain link fence and access gate, fibre chamber, concrete plinth and trunking cover for duct exit and cable run up pole. The development is required to carry the broadband data from the new high speed fibre broadband network on the island to the mainland by radiolink to connect to the NBI national fibre network as part of the government's national broadband plant to provide high speed broadband to all parts of the country that are not available commercially, including the islands, at the same data speed
To erect waste transfer building and all associated services. Gross floor space of proposed works: 169 sqm
Chun leac urláir choincréite atá ann cheana a scartáil (achar urláir 72.36 m²), agus teach aon stór 158.61m² a thógail chomh maith le, Córas séarachais, Ait siothlaithe agus don obair agus seirbhisí eile atá bainteach
For the construction of a fully serviced dwelling house and domestic garage. Gross floor space of proposed works: 204.1 sqm (Dwelling - 179.1 sqm, Garage - 25 sqm)
The brief summarizes the pattern across all 34 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181633The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief