Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 51 decisions within 5 km, 3 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For development consisting of retention of an existing telecommunications installation comprised of; a 15m support structure, antennas, dishes, associated equipment, cabinet and fencing used by the Emergency services (Garda, Fire Brigade and Ambulance). Planning permission is also sought for future additional telecommunications antennas, dishes and associated equipment cabinet
To erect a 21m high telecommunications monopole (including 3m high omni antenna with an overall height of 24m) together with antennas, dishes, and associated telecommunications equipment, all enclosed by security fencing and remove an existing 15m high monopole
For extension of existing single storey house, upwards and to the sides to create a two storey and single storey house. The proposal involves internal alterations and externally insulating the existing fabric, associated site services and landscaping works including replacement of metal shed. Gross floor space of proposed works: 162.06 sqm, Gross floor space of work to be retained: 101.43 sqm, Gross floor space of any demolition: 1.88 sqm
For construction of a new dwellinghouse with garage & wastewater treatment system
To construct a new dwelling house, treatment system and polishing filter as well as all ancillary site works. Gross floor space of proposed works 194 sqm.
For a dwelling house and private wastewater treatment system as constructed with the removal of the lifetime enurement clause. Gross floor space of work to be retained: 224 sqm
The brief summarizes the pattern across all 51 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181785The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief