CONSTRUCT DETACHED DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK/TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
MAGHERAFADDA , BALLYHEANE , CASTLEBAR
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
5% of nearby decided applications were refused. The preview found 175 nearby planning records within 5 km where a location match is available.
- Matched source
- 18569
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
EXTEND AND RENOVATE EXISTING HABITABLE HOUSE, TOGETHER WITH ALL ANCILLARY SITE WORKS
Change of house type to that previously granted under planning application P24/60539, and all associated site works at the above address.
Planning permission originally sought in 2019 (Ref. No. P18/569) to construct a detached dwelling house, domestic garage, septic tank/treatment system, and all associated site works at the above address.
CONSTRUCT NEW EFFLUENT TREATMENT SYSTEM
EXTENSION AND ALTERATIONS TO EXISTING PRIMARY SCHOOL, WORKS TO SET DOWN AREA ON MAIN ROAD/N84 BOUNDARY TO ACCOMMODATE ACCESS FOR EMERGENCY SERVICES, WORKS TO SOUTHERN BOUNDARY INCLUDING REMOVAL OF EXISTING HEDGE AND TREE LINED BOUNDARY AND REPLACEMENT WITH NEW FENCE AND PROVISION OF NEW PEDESTRIAN ACCESS, INCREASE SIZE OF YARD PLAY AREA AND CONSTRUCT WALKWAY AROUND THE PERIMETER OF THE SITE AND ALL ANCILLARY SITE WORKS AND SERVICES
The brief summarizes the pattern across all 175 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 18569The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief