Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 379 decisions within 5 km, 2 exact-site or onsite candidate records, and 18 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
18 structured nearby appeal records.
18 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a dwelling house and garage. Gross floor space of proposed works: 239.6 sqm (house), 20 sqm (garage)
For 2 no. three bedroom detached dwelling houses, foul sewer pumping station, connection to public sewer and all associated site development works. Gross floor space of proposed works: 232 sqm
To erect a 24 metre high lattice telecommunications support structure together with antennas, dishes, and associated telecommunications equipment, all enclosed in security fencing using an existing access track
Of dwelling house and garden sheds on revised site boundaries.Gross floor space of work to be retained 238.20sqm.
& completion for minor alterations to the previously permitted development, (granted under Pln ref: 23/60168 ). The development will consist of; Material Alterations to External façade of houses 01, 05 & 11; Relocation of ESB plinth; Repositioning of boundary wall to the south, southwest and north east of the site; and all associated site works and services
For the construction of 28no. dwellings consisting of: a.) 02no. detached 4 bedroom 2 storey dwelling; b.) 12no. semi-detached 4 bedroom 2 storey dwellings; c.) 02no. semi-detached 3 bedroom 2 storey dwellings; d.) 06no. terraced 3 bedroom 2 storey dwellings e.) 06no. terraced 2 bedroom 2 storey dwellings 2.) a new vehicular & pedestrian accesses from the L-4509 & the provision of 2 no. pedestrian crossings on the L-4509; 3.) ESB Substation; 4.) Provision of residential carparking including ducting to all spaces for future electric charging points; 5.) Provision of public & private open spaces, bicycle parking, site landscaping, play spaces and public lighting; 6.) connection to existing services, footpath connections, signage locations and all associated development works. The planning application is accompanied by a Natura Impact Statement. Gross floor space of proposed works 3,329.40sqm
The brief summarizes the pattern across all 379 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 191434The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief