Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
21% of nearby decided applications were refused. The site check found 234 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Chun an meid seo a leanas; Cead chun thuas staighre a athrú isteach ina spás cónaithe agus Cead le haghaidh fuinneoga agus velux ar an díón chomh maith le uasghradú a dheanamh ar ábhar an díon agus gach seirbhisí gaolmhara uilig. Spás urláir comhlán na n-oibreacha beartaithe: 62.4 sqm
Chun Forgnaimh le haghaidh treallamh iascaireachta a stóráil agus gach obair láithreáin eile atá ag teastáil
Chun an meid seo a leanas; 1) Cead chun thuas staighre a athrú isteach ina spás conaithe 2) Cead le haghaidh fuinneoga agus dormers ar an díon 3) Cead chun sineadh beartaithe a thogáil ar aghaidh agus cúl tí, 4) Cead chun páirt don tí a athrú isteach ina arasán "Granny Flat" chomh maith le gach seirbhisí gaolmhara uilig. Spás urláir comhlán na n-oibreacha beartaithe: 151.31 sqm. Spás urláir comhlán na hoibre atá le coinneáil: 160 sqm
For the development consisting of refurbishment and upgrading works [including (where necessary) replacement of existing poles along the existing overhead electricity line, minor ground works e.g. replacement or installation of stays, and maintenance or improvement works]; and all associated ancillary works including the provision of temporary accessways. Replacement poles will be constructed at, or immediately adjacent to, the existing structures that they will replace. Replacement poles will have a maximum height of 12m above ground; and be similar in appearance to existing poles. Planning permission is sought for a 10 year period. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application
Of existing side extension, glazed front porch and all associated site works. Gross floor space of work to be retained 15.25 sqm
Chun síneadh a dhéanamh as aghaidh, taobh agus cúl theach cónaithe dhormanta reatha, ina mbeidh 89.5sqm áit breise cónaithe, athrú leagan amach, fuinneoga so díon, seirbhísí agus oibreacha talamh a bhaineann. Spás uláir comhlán na n-oibreacha beartaithe 89.5 sqm.
The brief summarizes the pattern across all 234 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 191458The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief