Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 360 decisions within 5 km, 8 exact-site or onsite candidate records, and 15 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
15 structured nearby appeal records.
15 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To demolish existing dwelling and construct a replacement two storey dwelling and garage, installation of new wastewater treatment system, percolation area and all associated services and site works. Gross floor space of proposed works: 460 sqm (House - 332 sqm, Garage- 86 sqm). Gross floor space of any demolition: 103.6 sqm
To construct a dwelling house, garage, wastewater, treatment system and all associated services. Gross floor space of proposed works 251.1sqm.
For the Construction of a new Dwelling House, Domestic Garage, Sewage House, Domestic Garage, Sewage Treatment System, and all Associated Site Development Works: Gross floor space of proposed works: 285.7 sqm (House: 226 sqm, Garage: 59 sqm)
For the construction of a dwelling house, domestic garage, proprietary treatment system and for all other ancillary works. Gross floor space of proposed works: House - 220.2 sqm, Garage - 60 sqm
For the construction of a dwellinghouse, domestic garage, proprietary treatment system and percolation area and for all ancillary services and site works.Gross floor space of proposed works 160.00sqm.
To construct a dwelling house, garage, waste water treatment system and associated services. Gross floor space of proposed works: 201.2 sqm
The brief summarizes the pattern across all 360 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 191641The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief