Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 497 decisions within 5 km, 1 exact-site or onsite candidate record, and 21 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
21 structured nearby appeal records.
21 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To carry out the following: 1. Construct an extension to the existing dwelling house. 2. Retain the existing dog kennel enclosure to the rear of the dwelling house and all ancillary site works. Gross floor space of proposed works: 23.5 sqm. Gross floor space of work to be retained: 18 sqm
For amendments to the transformer compound development permitted under Galway County Council Planning Register Reference 25/60096 as follows: Modifications to the consented transformer compound palisade fence to include a single pedestrian access gate; construction of an interface (marshalling) kiosk and plinth located at the boundary between the transformer compound and the existing Cloon 110kV substation (interface kiosk to be enclosed by 2.6m tall palisade fence including a gate); construction of approx. 15m (length) of 1.5m wide walkway comprising of crushed limestone on geotextile, to connect Cloon substation fenced enclosure with the interface (marshalling) kiosk fenced enclosure; approx. 50m of 110kV underground electrical cable connecting the transformer compound to the existing Cloon Substation; construction of 6.5m high x 13m long fire wall within compound and; all associated site development, drainage, access and reinstatement works. A Natura Impact Statement will be submitted to the Planning Authority with the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
For a ten-year planning permission for an electrical transformer compound comprising (i) a hardcore surfaced compound with a footprint of approximately 1300m2 enclosed by a 2.6m high palisade security fence and security gates, (ii) a control room with a gross floor area of approximately 140m2, (iii) a 110kV electricity transformer, with associated equipment including cable sealing end, surge arrestor, earth disconnect, current/voltage transformer, house transformer, circuit breaker and lightning mast, (iv) a diesel generator for emergency lighting, (v) the upgrade of an existing access point from the L6141 and the construction of approximately 130m of access track, (vi) underground electrical and communications cabling, (vii) underground electrical cable connecting the transformer compound to the electrical cable permitted as part of the Tuam Energy Park (Galway County Council Planning Register Reference 20/1387) and (viii) all associated and ancillary site development, landscaping and reinstatement works. A Natura Impact Statement will be submitted to the Planning Authority with the application
Quarrying operations including the extraction of minerals (sand and gravel) over an area of 6.5ha to a final depth of 34m aod, mineral processing activities, the loading of materials, the transportation of materials from the quarry and all related ancillary works related to the same; the recovery of inert waste arising from construction and demolition (c and d) activity via the importation of inert material and the operation of an inert waste recycling facility; and the recovery of natural materials of clay, silt, sand, gravel or stone and which comes within the meaning of inert waste (resultant from the recycling and mineral processing proposed on-site) for the purposes of achieving a beneficial restoration for the site to agriculture. Planning permission is sought for a period of up to 10 years. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS). Area of site to which the application relates to 6.500 hectares
For the construction of a serviced dwelling with an effluent treatment system and a garage/shed. Gross floor space of proposed works: 211 sqm
For a 10-year permission for development at Cloonascragh, Tuam. The development will consist of the construction and operation of solar PV panels mounted on metal frames on a site extending to approximately 43ha and associated ancillary development including an electrical substation compound, control building (70 m2), up to 9 no. inverter units, underground cable ducts, hardstanding area, boundary security fence, site entrance, access track, landscaping, CCTV and all associated enabling works. The planning application is accompanied by a Natura Impact Statement. Gross floor space of proposed works: 92 sqm
The brief summarizes the pattern across all 497 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 191811The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief