Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 231 decisions within 5 km, 9 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct an external gantry crane including all associated works and services at a revised location within the site than where it was previously granted planning permission under Planning Ref No. 17/194 at existing manufacturing premises
To construct a product storage / warehousing building at the rear of existing manufacturing premises including all associated works and services. Gross floor space of proposed works: 1470 sqm
For the installation of 301 no. (530w) Photovoltaic (PV) solar panels on the existing roof of their existing factory and all associated facilities in the interest of energy conservation, on their lands. Gross works to be retained: 776(PV)
For the construction of two storage warehouses accessed via an existing entrance within the site of an existing commercial development, development to include a) associated road access including HGV access, b) provision of 32 parking spaces and bike storage c) provision of hard and soft landscaping including site lighting and all other associated and ancillary development and works above and below ground level. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development
For construction of a new ramped access into existing warehouse/workshop yard
For the erection of a 24m steel lattice telecommunication mast to sit on a new concrete pad foundation, together with the installation of 9 no. antennas, 3 no. transmission dishes, and ancillary telecommunications equipment and all associated site works. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application
The brief summarizes the pattern across all 231 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 191974The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief