(A) DEMOLISH AN EXISTING TWO STOREY DWELLING HOUSE ALONG WITH ANOTHER PARTLY DEMOLISHED DWELLING AND SHEDS/OUTBUILDINGS, (B) CONSTRUCT TWO NO. TWO STOREY SEMI-DETACHED DWELLINGS WITH CONNECTIONS TO THE SEWER AND WATER AND (C) ALL ASSOCIATED SITE WORKS AT CREAMERY ROAD
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
BROSNA WEST , TRALEE
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
4% of nearby decided applications were refused. The preview found 106 nearby planning records within 5 km where a location match is available.
- Matched source
- 19992
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
(A) DEMOLISH AN EXISTING TWO STOREY DWELLING HOUSE, ALONG WITH ANOTHER PARTLY DEMOLISHED DWELLING AND SHED/OUTBUILDING, (B) TO CONSTRUCT FOUR NUMBER TWO STOREY SEMIDETACHED DWELLINGS WITH CONNECTION TO THE SEWER, WATER AND (C) ALL ASSOCIATED SITE WORKS
CONSTRUCT TWO NUMBER 2 STOREY SEMI DETACHED DWELLINGSWTIH CONNECTIONS TO HTE SEWER, PUBLIC WATER AND ALL ASSOCIATED SITE WORKS
REPLACE A 25M MONOPOLE TELECOMMUNICATIONS STRUCTURE WITH A 30M LATTICE TELECOMMUNICATIONS STRUCTURE TOGETHER WITH ANTENNAS, DISHES AND ASSOCIATED TELECOMMUNICATIONS EQUIPMENT, ENCLOSED BY SECURITY FENCING
(A) RETAIN EXISTING EXTENSION TO REAR OF DWELLING HOUSE AS CONSTRUCTED (B) RETAIN ELEVATIONAL CHANGES TO EXISTING DWELLING HOUSE AS CONSTRUCTED
DEVELOPMENT OF 2 NO. ON SITE TRIAL BOREHOLE, CONSISTING OF WELLHEAD PROTECTION, CONTROL KIOSK AND ASSOCIATED PIPEWORK
The brief summarizes the pattern across all 106 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19992The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief