Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 244 decisions within 5 km, 2 exact-site or onsite candidate records, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a new dwelling house, domestic garage / fuel store with wastewater treatment plant percolation area and all associated site works. Gross floor space of proposed works: 317.62 sqm (258.12sqm house & 59.5sqm garage)
To construct a dwelling house with wastewater treatment plant, polishing filter, domestic garage and all associated site works
For the construction of a dwelling house, domestic garage/fuel store, proprietary treatment system, percolation area and associated works. Gross floor space of proposed works 227.63sqm.
For the construction of a dwelling house, domestic garage/fuel store, waste water treatment system, percolation area and all associated site works. Gross floor space of proposed works; 269.9sqm (house 241sqm, garage 28.9sqm)
For the construction of a single-storey building with an external covered walkway to accommodate classrooms & associated ancillary accommodation. An existing derelict stone mortuary building is to be renovated & incorporated into the proposed development as circulation & social space. External works include landscaping, extension of existing site & all other site works required to facilitate the development
For an off-road, drop-off/pick-up area and a new entrance with all associated services
The brief summarizes the pattern across all 244 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201619The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief