Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 66 decisions within 5 km, 2 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a new dwelling house, domestic garage, septic tank/ treatment unit with percolation area and all associated site works. 100.6 sqm (house), 42.4 sqm (garage)
To construct a new dwelling house, domestic garage, septic tanks/ treatment unit with percolation area and all associated site works. Gross floor space of proposed works: 100.6sqm (House) and 42.4sqm (Garage)
For a) a new two storey house, b) use of agricultural access for house access to the R355, c) a new proprietary waste water treatment system and filtration area, d) a new agricultural vehicular access to the R355, e) all associated site works. Gross floor space of proposed works 232 sqm.
For the following development at Laurencetown National School: (a) relocation of existing pedestrian entrances and car parking areas from front of school building to designated area within site curtilage (b) new site access and inner roadway with provisions for set down, staff and visitor carparking (c) construction of covered pedestrian walkway (d) construction of an all weather playing surface with perimeter fencing and flood lighting (e) new playing field with associated flood lighting (f) installation of 1 no. prefabricated modular portacabin unit for use as additional room space for after school with provisions for ancillary works and connection to existing septic tank system (g) new bicycle parking area with covered shelter (h) 1.5m wide pedestrian walkway to perimeter of site (i) and all associated external site works (gross floor space portacabin 53.55sqm)
For change of prefabricated building providing afterschool facility approved under planning reference no. 171855 at Lawrencetown National School to a permanent single storey building with revised building layout, septic tank, connection to all essential services and all associated site development works. (Gross floor space 160sqm). Gross floor space of proposed works: 173 sqm
Of a material change of use from a domestic garage to contain living accommodation (consisting of a kitchen/living area, bedroom and shower room)
The brief summarizes the pattern across all 66 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201740The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief