Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 198 decisions within 5 km, 4 exact-site or onsite candidate records, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For (a) existing building on revised site boundaries (b) change of use of the former social welfare office to a residential unit and all associated site works.
For development consisting of the removal of 1 no. existing 10 metre telecommunication support structure with attached omni antenna (overall height of 13 metres) and its replacement with 1 no. new 18 metre telecommunication support structure (overall height of 21metres) carrying equipment transferred from the existing structure and the addition of new telecommunications antennas, dishes and associated equipment, together with new ground based equipment cabinets, new fencing and all associated site works.
For the demolition of an existing vacant bungalow dwellinghouse and the construction of a new carpark and bus set down area at Portumna Castle. The proposed carpark is within the curtilage of the Recorded Protected Structures of Portumna Castle and Portumna Castle gate lodge.
For 1. Change of use of ground floor area from retail to residential, 2. Demolition of single story extension to rear in courtyard, 3. Demolition of first and second floor bridge link, to rear, Northern elevation, in courtyard and installation of two new windows at first and second floor levels. 4. Installation of a ground floor window, serving kitchen, Western elevation facing onto Abbey court. 5. Approval for new ground floor window facing onto Abbey Street, southern Elevation. 6. Approval for new first floor window, North elevation, facing into courtyard. 7. Alteration of 2 no ground floor windows, to kitchen in courtyard, East Elevation. 8. Construction of new ground floor link/corridor, Northern Elevation in courtyard, including all associated works and making good. Gross floor space of proposed works 3sqm. Gross floor space of any demolition 14.92sqm.
For the conversion of existing Barn structure into residential use for the purposes of short term letting. Works will include a new roof, opening up of existing blocked up windows, connection into existing services on site and all associated site services. Gross floor space of proposed works: 43.58 sqm
For the construction on an infill site of 1 no. commercial unit on the ground floor, 1 no. office unit at first floor level and all associated services. Gross floor space of proposed works: 253.1 sqm
The brief summarizes the pattern across all 198 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201744The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief