Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
28% of nearby decided applications were refused. The site check found 210 decisions within 5 km, 1 exact-site or onsite candidate record, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a new dwelling house, effluent treatment system and polishing filter as well as all ancillary site works. Gross floorspace of proposed works: 174.97 msq
To (1) refurbish and make alterations to existing stone cottage (2) proposed extension to existing stone cottage (3) installation of new effluent treatment system and polishing filter as well as all ancillary site works. This planning application is accompanied by a NIS, as required by Article 239 of the Planning and Development Regulations, 2001 (as amended). Gross floor space of proposed works: 90.00 sqm. Gross floor space of work to be retained: 43.20 sqm
To construct a new farm machinery storage shed as well as all ancillary site works. This planning application is accompanied by a NIS, as required by Article 239 of the Planning and Development Regulations, 2001 (as amended). Gross floor space of proposed works: 90.00 sqm
To construct three glamping pods and wastewater treatment system with polishing filter as well as all ancillary site works and site services. This planning application is accompanied by a NIS, as required by Article 239 of the Planning and Development Regulations, 2001 (as amended). Gross floor space of proposed works: 103 sqm
To (1) demolish existing substandard two storey house and replace with a new two storey dwellinghouse (2) replace existing septic tank and percolation area with a new treatment system and polishing filter as well as all ancillary site works (gross floor space proposed 114.76sqm, demolition 105.81sqm)
For (1) extension to existing dwelling, (2) conversion of existing attic space to a habitable area, (3) Installation of a new wastewater treatment system and associated polishing filter bed, (4) retention of existing garden shed as well as all ancillary site works and services
The brief summarizes the pattern across all 210 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201944The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief