Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 288 decisions within 5 km, 2 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the construction of a new dwelling house, domestic garage, treatment plant, percolation area and all associated site works. Gross floor space of proposed works: House 265 sqm, Garage 40 sqm
For dwelling house, garage, wastewater treatment/percolation and all associated services. Gross floor space of proposed works: 265 sqm (house) & 60 sqm (garage)
For the construction of a new dwelling house, domestic garage, treatment plant, percolation area and all associated site works. Gross floor space of proposed works: House 265 sqm, Garage 40 sqm
For the construction of a two-storey dwelling, domestic garage, proposed new sewage treatment system, percolation area and all associated site development works. Gross floor space of proposed works: 147 sqm (house) & 60 sqm (garage)
For the construction of a dwelling along with an on-site wastewater treatment system, domestic garage and all associated site works. Gross floor space of proposed works: House: 211.5sqm & Garage: 43.2sqm
For the construction of a dwelling along with on site wastewater treatment system, domestic garage and all associated site works. Gross floor space of proposed works: 209 sqm (house) & 43.2 sqm (garage)
The brief summarizes the pattern across all 288 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201993The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief