Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
29% of nearby decided applications were refused. The site check found 236 decisions within 5 km, 10 exact-site or onsite candidate records, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To (1) retain and complete existing blockwork structure to the rear elevation of two terrace houses (2) permission to raise the existing roof heights to allow for an additional habitable floor space on proposed second floor level of two terrace houses (3) proposed external and internal alterations to the two terrace houses as well as all associated site works. Gross floor space of proposed works: 60.71 sqm. Gross floor space of work to be retained: 199.19 sqm
Is sought to [1] retain and complete existing blockwork structure to the rear elevation of two terrace houses [2] permission to raise the existing roof height to allow for an additional habitable floor space on proposed second floor level of two terrace houses [3]proposed external & internal alterations to the two terrace houses as well as all associated site works. Gross floor space of proposed works: 100.72 sqm. Gross floor space of work to be retained: 199.19 sqm
1) retain and complete existing blockwork structure to the rear elevation of two terrace houses, 2) to raise the existing roof heights to allow for an additional habitable floor space on proposed second floor level of two terrace houses, 3) proposed external and internal alterations to the two terrace houses as well as all associated site works. Gross floor space of proposed works: 259.90 sqm (house)
To demolish exiting derelict terrace house and construct a proposed terrace house at Hulk Street. Gross floor space of proposed works: 84 sqm. Gross floor space of any demolition: 81 sqm
For (1) change of use from existing hostel into three residential townhouses (2) proposed external and internal alterations to the existing building as well as all associated site works. Gross floor space of work to be retained 366 sqm.
For works including the demolition of a single storey glazed conservatory on the ground floor hotel courtyard (south-facing) side & a the construction of a new replacement structure with minor extensions consisting of a new bay window & entrance node. The proposal also includes internal changes including expansion of the restaurant, relocation of the reception, increased bar area & re-purposing of conference room 1 into a new bar/lounge area. The proposed development is within the curtilage of Protected Structures (PRS no. 596) although the Protected Structures are not affected directly by the works
The brief summarizes the pattern across all 236 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 202035The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief