Development on this 2.18 ha site, approximately, at lands adjoining an existing residential development (Rockfield Park), Railpark, Celbridge Road, Maynooth, Co. Kildare. (This forms Phase 1 of a residential masterplan for some 105 no. units in total on a wider c. 3.26 ha landholding under the Applicant’s control). The proposed Phase 1 development will consist of: Construction of a residential development comprising 58 no. dwellings in total, consisting of 18 no. two-bedroom two storey houses, 14 no. three-bedroom three storey houses and 2 no. four-bedroom three storey houses (34 no. houses in total) including rear private open spaces; 12 no. one-bedroom apartments and 12 no. two-bedroom apartments (24 no. three storey duplex apartments in total), including balconies. The development will also include: new vehicular, cyclist and pedestrian access from Celbridge Road; a new pedestrian footpath and cycle track along the main site frontage to Celbridge Road; the provision of future access connection points to adjacent lands to the northeast (Phase 2), northwest and the southeast; works to facilitate connections to existing services infrastructure to the northeast via Phase 2 lands. The development will also comprise internal roads, footpaths, cycle tracks, public open spaces, and bicycle store areas; parking at surface level (117 no. total spaces for car parking and 30 no. bicycles spaces); drainage attenuation; all hard and soft landscaping; boundary treatments; removal of the existing hedgerows adjacent to Celbridge Road, changes in levels; and all ancillary site development works and site services provision (including wayleave to the north-east) above and below ground
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Railpark , Celbridge Road , Maynooth
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 1,268 nearby planning records within 5 km where a location match is available.
- Matched source
- 21155
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
For amendment of the design of the Crèche granted under planning permission 21/155, retaining the granted plan, but reducing the overall roof height. Revised by Significant Further Information which consists of the correction of the planning register number being applied to amend, now 21/156 in place of 21/155, and the revised design of the creche in response the request for further information from Kildare County Council
Of an existing 19m2 shed and an existing 12m2 freestanding utility room/WC constructed to the rear of the existing 2-storey end of terrace dwelling and all associated ancillary site development works above and below ground
Development on this 1.99 ha site, approximately, at lands adjoining an existing residential development (Rockfield Court), Railpark, Celbridge Road, Maynooth, Co. Kildare. (This forms Phase 2 of a residential masterplan for some 105 No. units in total on a wider c. 3.26 ha landholding under the Applicant’s control). The proposed Phase II development will consist of: Construction of a residential development comprising 47 No. dwellings in total, consisting of 11 No. two-bedroom two storey houses and 10 No. three-bedroom three storey houses (21 No. houses in total) including rear private open spaces; 13 No. one bedroom apartments and 13 No. two-bedroom apartments (26 No. three storey duplex apartments in total), including balconies and a single storey crèche facility (c.261 sqm). The development will also include: new vehicular, cyclist and pedestrian access from Celbridge Road via currently undeveloped lands to the southwest (Phase 1); a new pedestrian footpath and bicycle track along the site frontage to Celbridge Road; the provision of future access connection points to adjacent lands to the southwest (Phase 1), north and the southeast; works to facilitate connections to existing services infrastructure in Rockfield Park to the west. The development will also comprise internal roads, footpaths, cycle tracks, public open spaces, children’s play area and bicycle store areas; parking at surface level (95 No. total spaces for car parking and 33 No. bicycles spaces); drainage attenuation; all hard and soft landscaping; boundary treatments; removal of the existing hedgerows adjacent to Celbridge Road; changes in levels; and all ancillary site development works and site services provision (including wayleave to the north-east) above and below ground
For extended vehicle access to front with planning permission to reduce the vehicle access with block wall and block pillars to 4.68m to match all with ancillary works
A 5m high concrete hurling wall and 5m high ball stop fence to the rear of the existing school site and associated sundry other site works
The brief summarizes the pattern across all 1,268 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 21155The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief