Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
23% of nearby decided applications were refused. The site check found 449 decisions within 5 km, 1 exact-site or onsite candidate record, and 22 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
22 structured nearby appeal records.
22 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A change of use from retail use to retail with ancillary off licence use
A High Power Electric Vehicle Charging Station within the existing Mayfield Interchange Services Area. The development will consist of: (i) Installation of 6 No. electric vehicle charging bays, each comprising a parking space and electric vehicle charging unit; (ii) Associated revisions to existing car parking area; (iii) Installation of electric vehicle power units and associated fencing; (iv) Construction of a new substation; (v) Erection of illuminated signage; (vi) All associated lighting, infrastructure, site and development works
The installation of a 12m high Main Identification Totem sign.
1. Installation of 24no. electric vehicle car charging bays, 2no. electric vehicle bus charging bays, and 2no. electric vehicle truck charging bays, each comprising a parking space and electric vehicle charging unit; 2. Installation of 59no. staff car parking spaces and relocation of 17no. truck parking spaces; 3. Installation of 10no. electric vehicle power unit’s c/w 2.0m high palisade fence enclosure; 4. Construction of extension to the existing ESB substation building (24sq.m); 5. Site development works to include the following, installation of 1no. covered bicycle parking area, 1no. covered smoking shelter, construction of 2no. dog walking tracks, acoustic perimeter fencing, site lighting, precast kerbing, surfacing, landscaping, and all associated drainage works
Sought for the construction of a proposed dog park and staff parking area with EV charging points, bicycle stand, smoking shelter and acoustic perimeter fence and associated site works
At this site Mayfield Interchange Services Area, Junction 14 M7 Motorway, Mayfield, Monasterevin, Co. Kildare. The development will consist of the construction of a single storey truck driver lounge; Installation of canopy with associated signage above the CNG (compressed natural gas) fuel dispenser area granted permission under planning reference number 20/1475 and associated site works
The brief summarizes the pattern across all 449 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211637The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief