Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 175 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the construction of a serviced dwelling with an effluent treatment system and a garage/shed. Gross floor space of proposed works: 204 sqm (dwelling) & 60 sqm(garage)
Construction of an extension to the northwest side of the existing dwelling house granted under P00/1502. Including all other ancillary site work and services.
RETENTION OF EXISTING GARAGE TO THE SOUTHEAST OF THE SITE AND THE CLOSING UP OF EXISTING ACCESS TO THE SOUTHEAST INCLUDING ALL OTHER ASSOCIATED WORKS AND SERVICES
RETENTION OF THE CHANGE OF 4 NO. WINDOW DESIGN FROM VELUX TO DORMER WINDOWS ON THE EXISTING DETACHED DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS
Construct a building for use ancillary to the dwelling house as overflow accommodation and to provide a new upgraded proprietary effluent treatment unit and percolation area to serve both the proposed development and existing dwelling house combined, along with all associated services
CONSTRUCTION OF A GARAGE
The brief summarizes the pattern across all 175 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 212481The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief