Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 360 decisions within 5 km, 2 exact-site or onsite candidate records, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
14 structured nearby appeal records.
14 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct a dwelling house, domestic garage/fuel store, septic tank, treatment system and percolation area and all ancillary site works.
Consisting of the construction of a single storey dwelling house (c.114 sq.m.), waste water treatment system and all associated site works. Gross floor space of proposed works: 114 sqm
For the construction of and a 40-year operation and subsequent decommissioning of a 48.01-hectare solar farm (red line boundary) and underground cabling. The solar farm comprises of one single land parcel and is divided by existing farm access tracks and hedgerows. The proposed Solar Farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures, together with electrical transformers, transformer maintenance bays, a temporary construction compound, the use of existing farm access tracks, existing site entrance, inverters, CCTV poles and cameras, deer type security/boundary fencing, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity. A Natura Impact Statement will also be submitted to the Planning Authority with this application. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413). It is important to note that the planning application is subject to section 34D. When a notice issues in accordance with section 34(b), the provisions of article 26A shall apply
For change of plan and to make alterations to front elevation of the proposed extension granted permission under planning reference 19/571 and all associated works. Gross floor space of proposed works 75sqm
To a) construct a new two storey extension to the west side of dwelling house, b) retain shed and dog cage at rear of site including all associated works. Gross floor space of proposed works 81 sqm. Gross floor space of work to be retained 50 sqm.
To block up existing entrance/gateway to field and create a new field entrance/gateway as per site layout including all ancillary site development works.
The brief summarizes the pattern across all 360 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 212535The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief