Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 129 decisions within 5 km, 4 exact-site or onsite candidate records, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Adjusted location of front entrance wall; Adjusted location of vehicle entrance to house site;Construction of domestic garage and field shelter;and all associated site and ancillary works.
An extension and renovations to dwelling including; (1) permission to construct rear extension (2) permission to develop first floor accommodation by raising the existing blockwork and roof and (3) permission to replace existing septic tank system with new waste water treatment system and percolation area and (4) associated site works
The demolition of existing pillar and portion of bay window and permission to extend and renovate dwelling
A dwelling, effluent treatment system and entrance along with all associated site works
Development to construct/erect dwelling house (storey & a half), connection to public water supply, site specific effluent treatment system with raised bed percolation area, garage & store, entrance and all associated works
(i) for the demolition of an existing extension to the rear of dwelling, (ii) to construct a new extension to existing dwelling, (iii) to carry out elevational amendments to the existing dwelling (iv) to relocate the existing vehicular entrance (v) to construct a new waste water treatment system (vi) for a residential unit (mobile home) and continuance of use until construction on the proposed extended dwelling is complete and all associated site works
The brief summarizes the pattern across all 129 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2260372The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief