Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 22 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a (1) new dwelling house, garage, effluent treatment system and polishing filter as well as all ancillary site works at Tievebaun Td, Co. Galway. Gross floor space of proposed works 188.61 sq m.
For the removal of an existing septic tank and the installation of a waste water treatment system and raised percolation area, together with all associated site works. The application is accompanied by a Natura Impact Statement (NIS)
To construct a new dwelling house, garage, effluent treatment system and polishing filter as well as all ancillary site works. This planning application is accompanied by a NIS, as required by Article 239 of the Planning and Development Regulations, 2001(as amended). Gross floor space of proposed works: 271 sqm (House) and 54 sqm (Garage)
For the development consisting of extraction of rock from an area consisting of 1.9 hectares which was previously subject to rock extraction; Extraction of rock will be undertaken by blasting means down to a level of 36.4 meters ordnance datum; processing of material using mobile crushing and screening plant; All associated ancillary facilities/works; Screening berms and landscaping. The duration of the proposed works is over a 25 year period. The application is accompanied by a Natura Impact Statement (NIS)
For development consisting of extraction of rock from an area consisting of 1.9 hectares which was previously subject to rock extraction; Extraction of rock will be undertaken by blasting means down to a level of 36.4 m ordnance datum. Processing of material using mobile crushing and screening plant; All associated ancillary facilities / works; Screening berms and landscaping. The duration of the proposed works is over a 25 year period. This application has been accompanied by a Natura Impact Statement [NIS].
For the construction of a new agricultural shed as well as all associated site works and ancillary services
The brief summarizes the pattern across all 22 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2260848The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief