Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 565 decisions within 5 km, 7 exact-site or onsite candidate records, and 26 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedZoning and settlement layers were intersected with the selected site against the loaded source datasets.
2 matchedOne current citation from the Galway County Council development plan, with section, page and source URL.
1 matched3 of 4 layers are loaded for Galway County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
26 structured nearby appeal records.
26 matchedCitations are current-dated and carry policy name, section, page and source URL from the Galway County Council development plan.
1 matchedOpen preview
Open preview
Of the erection of a Primary Care Centre building consisting of 2 storeys to include pharmacy retail unit at ground level with surface carparking, associated signage, boundary treatment, connection to public services, ground and roof mounted plant & equipment and all ancillary and associated works including reconfiguration and widening of the existing Montiagh Road carriageway and footpath links from the site to the junction with the N83 Galway Road. Gross floor space of proposed works 2817sqm.
For development which will consist of the erection of a Primary Care Centre building consisting of 2 storeys with part 3 storeys to include pharmacy retails unit at ground level with surface carparking, associated signage, boundary treatment, connection to public services and all ancillary and associated works. Gross floor space of proposed works: 3405 sqm.
For the subdivision of existing site approved under Pl Ref: 97/1328 and the construction of a two-storey dwelling house, vehicular access and all associated siteworks and services. Gross floor space of proposed works 225.73 sqm
For development consisting of the construction of a revised house type of 260.75 sqm and in a revised position on site from that granted by P.L. Ref. 19/134, together with construction of a domestic garage and all necessary site works on an enlarged site. Gross floor space of proposed works: 260.75 sqm
For (a) the construction of a new dwelling house to include construction of a new site entrance gateway to serve new development, (b) subdivision of existing site approved under pl. ref. no. 96-2681, (c) connection to all existing services and (d) for all associated site development works. Gross floor space of proposed works: 170 sqm
Of dwelling granted under ref: 97/602 on revised boundaries, along with all associate site works:
The brief summarizes the pattern across all 565 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2260948The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief