Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 496 decisions within 5 km, 2 exact-site or onsite candidate records, and 23 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
23 structured nearby appeal records.
23 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For retention of extension consisting of outdoor and indoor storage areas roofed children's play area and permission for extension to creche and permission for construction of extension and change of opening hours.Gross floor space of work to be retained 95.00sqm and gross floor space of proposed works 12sqm.
To construct an extension to the rear and side of the existing dwelling house and all ancillary site works. Gross floor space of proposed works: 42 sqm
And complete new changing rooms, plant room facilities for referees and match officials, terracing and to construct a new roof to existing stand and terraced area to include press area, toilets, shop, storage, control room, hospitality area, upgrade of existing stand and ancillary works at Tuam Stadium. Gross floor space of proposed works: 1271 sqm. Gross floor space of work to be retained: 1200.3 sqm
For a) floodlighting to existing GAA Grounds to include 4 No. lighting columns with light fittings to provide a minimum 500lux lighting scheme b) New access stairs and platform lifts to the existing stand/seated terrace c) To retain existing toilet block adjacent to existing seated terrace d) Construct new 2.4m high boundary walls to part of existing boundary to form revised boundaries to previously approved permission Reference 19/768 at Tuam Stadium, Tirboy Td, Tuam. Gross floor space of proposed works: 56 sqm. Gross floor space of work to be retained: 60 sqm
And completion of dwellinghouses numbered 31-34 inclusive (gross floor space retention 200sqm; proposed 167sqm)
To construct 3 dwelling houses. Gross floor space of proposed works 344.6 sqm.
The brief summarizes the pattern across all 496 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2260977The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief