Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 556 decisions within 5 km, 5 exact-site or onsite candidate records, and 25 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
25 structured nearby appeal records.
25 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the consruction of a single dwelling house, domestic garage, proprietary effluent treatment system, percolation area and all associated site services. Gross floor area of proposed works: 200.00 sqm (dwelling house) and 105.00 sqm (garage)
For the construction of a single dwelling house, domestic garage, a Ter 3 Tertiary effluent treatment system & percolation area and all associated site services. Gross floor area of proposed works: 200.00 sqm (dwelling house) and 105.00 sqm (garage)
To construct a domestic garage with first floor storage loft. Gross floor space of proposed works (garage grd) 40 sqm. (loft) 25 sqm.
For [1] retention of the provision of a site entrance and internal site access roadway [2] retention of the clearance of the proposed dwelling house oversite [3] permission for the construction of a dwelling house, garage, waste water effluent treatment unit, percolation area and all associated site services. Gross floor space of proposed development: 269 sqm
To erect dwelling house, domestic garage, wastewater treatment system, polishing filter and all associated services. Gross floor space of proposed works: House - 258.40 sqm, Garage - 50.00 sqm
To construct a new dwelling, domestic garage, septic tank, treatment system, percolation area and associated works. Gross floor space of proposed works: House - 240 sqm, Garage - 105 sqm
The brief summarizes the pattern across all 556 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2261013The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief