12% of nearby decided applications were refused. The site check found 415 decisions within 5 km, 2 exact-site or onsite candidate records, and 22 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
22 structured nearby appeal records.
22 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct and complete a solar pv energy development with a total site area of circa 24.51 hectares, to include electrical transformer and inverter station modules, solar pv panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, cctv and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works, the solar farm would be operational for 35 years, access will be gained from a private lane off the l-7117 to the northeast, this access point and part of the internal access track is within the red line boundary of the consented ballymoneen solar farm application (planning ref: 20/961).Gross floor space of proposed works 768.00sqm.
To construct and complete a Solar PV Energy development with a total site area of circa 25 hectares, to include electrical transformer and inverter station modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabin and ducting. CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works. The solar farm would be operational for 35 years. Gross floor space of proposed works: 768 sqm
Of pl ref 20/961 for permission for development at this site at Ballymoneen and Grange East, Co Galway. The development will consist of a planning permission for a period of 5 years to construct and complete a Solar PV Energy and Battery Storage development with a total site area of circa 140.9 Hectares to include a single storey electrical substation building, electrical transformer and inverter station modules, solar PV panels ground mounted on support structures, battery containers and associated infrastructure, internal access tracks, security fencing, electrical cabling/ ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works related to the access to the site. The solar farm would be operational for 35 years. Gross floor space of proposed development: 1886.39 sqm
For permission for development at this site at Ballymoneen and Grange East, Co Galway. The development will consist of a planning permission for a period of 5 years to construct and complete a Solar PV Energy and Battery Storage development with a total site area of circa 140.9 Hectares to include a single storey electrical substation building, electrical transformer and inverter station modules, solar PV panels ground mounted on support structures, battery containers and associated infrastructure, internal access tracks, security fencing, electrical cabling/ ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works related to the access to the site. The solar farm would be operational for 35 years. Gross floor space of proposed development: 1886.39 sqm.
For the development. The development will consist of the construction of a new 2.4m high security fence and all associated site works for the purpose of enclosing an existing telecommunications container and ancillary equipment
For the replacement of approximately 216m of existing 2.4m high chainlink fencing and associated gates with 216m of new 2.4m high green palisade security fencing/gates and all associated site works at an existing Above Ground Natural Gas Installation.
The brief summarizes the pattern across all 415 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2261105The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.