Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 131 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedZoning and settlement layers were intersected with the selected site against the loaded source datasets.
2 matchedOne current citation from the Galway County Council development plan, with section, page and source URL.
1 matched3 of 4 layers are loaded for Galway County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedCitations are current-dated and carry policy name, section, page and source URL from the Galway County Council development plan.
1 matchedOpen preview
Open preview
(a) retain existing dwelling house, septic tank and percolation area previously granted under planning ref. no. 03/3422 on revised site boundaries (b) retention permission for the construction of a domestic garage (C) and all associated site services.Gross floor space of work to be retained 210sqm.
To construct a slatted shed with feed passage, manure pit to include concrete aprons and all associated site works
And completion of partially constructed domestic garage and fuel store and all associated site services. Gross floor space of work to be retained: 166.27 sqm
(a) changes to existing dwellinghouse which was granted planning permission under planning reference number 01/5005, (b) construction of a plant room/services building, (c) retention & completion of partially constructed domestic garage & fuel store, (d) retain the dwellinghouse, plant room/services building, domestic garage & fuel, treatment unit, percolation area & all associated site services on revised site boundaries
(a) changes to existing dwelling house which was granted planning permission under planning reference number 01/5005 (b) the construction of a plant room/services building, (c) the retention and completion of partially constructed domestic garage and office/gym (d) retain the dwelling house, plant room/services building, domestic garage and office/gym, treatment unit, percolation area and all associated site services on revised site boundaries.Gross floor space of work to be retained 107.25sqm.
To; 1. Construct shed to accommodate milking parlour, dairy, plant/store, office and associated animal handling facilities. 2. Construct collection yard with slatted tank and slatted channel. 3. Erect meal bin to include concrete aprons and all associated site works. Gross floor space of proposed works: Shed= 367.79sqm, Collection=369.60sqm, Aprons=177.60sqm
The brief summarizes the pattern across all 131 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2261122The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief