One-off house / within 5 km where a location match is available
Executive snapshot
35% of nearby decided applications were refused. The site check found 40 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the construction of new ferry staff accommodation, office and equipment storage along with a wastewater treatment system. Gross floor space of proposed works 134.00 sqm
To (1) refurbish and extend semi ruinous dwelling (2) construct new single storey extension (3) install new effluent treatment system and polishing filter (4) new vehicular site entrance as well as all associated site works and site services. This planning application is accompanied by a NIS, as required by Article 239 of the Planning and Development Regulations, 2001 (as amended).Gross floor space of proposed works 94.00sqm.
To demolish an existing semi ruinous dwelling and construct a new cottage dwelling with wastewater treatment system and new entrance road. The application includes a Natura Impact Statement (NIS). Gross floor space of proposed works: 119 sqm. Gross floor space of any demolition: 45 sqm
For development of two camping pods at the existing campsite at Inishbofin hostel. Gross floor space of proposed works 4.6sqm.
For the construction of a dwelling house, secondary wastewater treatment unit and soil polishing filter, together with associated site works. This application will be accompanied by a Natura Impact Statement (NIS) and a Construction Environmental Management Plan (CEMP). Gross floor space of proposed works: 144 sqm(H)
For the construction of a dwelling house, secondary wastewater treatment unit and soil polishing filter, together with associated site works.This application will be accompanied by a Natural Impact Statement (NIS) and a Construction Environmental Management Plan (CEMP). Gross floor space of proposed works: 144.00 sqm
The brief summarizes the pattern across all 40 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2261155The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief