Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
29% of nearby decided applications were refused. The site check found 232 decisions within 5 km, 4 exact-site or onsite candidate records, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention and completion of works on site to revised all-weather surface pitch design, previously granted under PL Ref No. 20/293, as well as all associated fencing and flood lighting as well as all ancillary site works. Gross floor space of works to be retained 2400 sqm.
For a single all-weather surface pitch with associated fencing and flood lighting as well as all ancillary site works. Gross floor space of proposed works: 2400 sqm
For two all-weather surface pitches with associated fencing and flood lighting as well as all ancillary site works. Gross floor area of proposed works: 3,960sqm (SPLIT DECISION - REFUSE PERMISSION FOR FLOOD LIGHTING)
For (1) construction of a new playschool childcare facility (2) connection to all public services as well as all ancillary site works and site services. Gross floor space of proposed works 166.10sqm
For an extension and alterations to an existing National School together with all associated services
For (1) construction of a new playschool childcare facility (2) connection to all public services as well as all ancillary site works & site services
The brief summarizes the pattern across all 232 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2261163The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief