Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
19% of nearby decided applications were refused. The site check found 298 decisions within 5 km, 1 exact-site or onsite candidate record, and 15 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
15 structured nearby appeal records.
15 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For 10-years for the development of a solar farm on a site of 125 hectares consisting of the following: 570,952sqm of solar photovoltaic panels on ground mounted steel frames; 18 hardstanding locations, with each containing 3no. electrical skids (each hardstanding location will be surrounded by a palisade fence & gates); underground power & communications cables & ducts, including cabling along the L-8560, L-4506, L-4505 & R347 public roads; 4 joint bays; new internal access tracks; a new access from the R347 public road; upgrade to existing access points along the L-4505 and R347 public roads; access gates; landscaping & biodiversity enhancement measures; security gates; boundary fencing & all associated ancillary development, site works & services. The solar farm will be operational for 40 years. A Natura Impact Statement will be submitted to the planning authority with the application
To construct an independent living unit attached to existing dwellinghouse and all associated works
For the Construction of a new slatted shed & calf creep area & an extension to the loose shed and all associated ancillary concrete works. Gross floor space of proposed works: 346.752 sqm. Gross floor space of work to be retained: 185.76 sqm
For extensions to existing dwelling house and all associated site works. Gross floor space of proposed works 93.97sqm.
For the construction of a new slatted shed with a loose bedded area and all associated ancillary concrete works. Gross floor space of proposed works: 384.48sqm.
For the construction of a garage/shed. Gross floor space of proposed works: 60.00 sqm
The brief summarizes the pattern across all 298 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2361143The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief