Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 426 decisions within 5 km, 2 exact-site or onsite candidate records, and 19 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
19 structured nearby appeal records.
19 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For an infill residential development to the existing estate. The development will consist of the following: 1. decommissioning and removal of existing temporary on-site treatment plant and new connections to be made to existing public services; 2. construction of 38 no. residential dwellings consisting of: a. 8 no. 4 bedroom 2 story semidetached dwellings; b. 26 no. 3 bedroom 2 story semidetached dwellings; c. 4 no. 2 bedroom 2 story semidetached dwellings; 3. repositioning of existing substation; 4. revised road alignment to existing estate entrance; 5. new vehicular and pedestrian accesses onto the existing internal estate road; 6. provision of public and private open spaces, bicycle parking, site landscaping, play spaces and public lighting; 7. provision of residential carparking including ducting to all spaces for future electric charging points; 8. footpath connections, signage locations and all associated development works. Gross floor space of proposed works: 4290 sqm
Of one bed apartment, garden shed and raised rear boundary wall
To erect 670 sqm or 135.90 kW of photovoltaic panels on the roof of existing unit of our factory with all associates site works. Gross floor space of proposed works: 670 sqm
To retain existing site entrance, permission to divide existing site (Pl.Ref.No: 10/413) to Site "A" and "B", reduce floor area of existing creche on Site "A", change of use of remaining floor area of creche to two bedroom residential apartment on Site "B" and all associated services on Site "B". Gross floor space of proposed works 87.2 sqm + 68.8 sqm.
Of existing site entrance, permission to divide existing site (Pl. Ref. No: 10/413)) to Site "A" and "B", reduce floor area of existing creche on Site "A", change of use of remaining floor area of creche to two bedroom residential apartment on Site "B" and permission for new site entrance and all associated services on Site "B". Gross floor space of proposed works: 97.5 sqm + 59.5 sqm
To erect 1,222 sqm or 247.50 KW of photovoltaic panels on the roof of existing unit of our factory with all associated site works at SIP Energy Limited.
The brief summarizes the pattern across all 426 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2361431The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief