Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
22% of nearby decided applications were refused. The site check found 372 decisions within 5 km, 2 exact-site or onsite candidate records, and 13 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
13 structured nearby appeal records.
13 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Don athruithe agus leathnúcháin aon / dhá stór ar aghaidh agus ar chúl an tí atá anois ann, oiriúnú cuid den áiléar san áireamh (98.7sqm), chomh maith le hathruithe agus oibreacha suímh bainteach, ionad cóireála agus limistéar síothlaithe nua
For alterations & single storey extensions to the front & side & associated elevational changes to an existing dwellinghouse & all associated site works including a new treatment plant & percolation area. Gross floor space of proposed works 92.00sqm
Cead pleanála dhá lorg chun Garáiste nua a thogail chomh maith le aon seirbhisi a bhaineann leis an forbairt ag an seoladh thuas.Spás urláir comhlán na n-oibreacha beartaithe 54m2.
Chun teach nua cónaithe a thógáil chomh maith garáiste nua, córás searachais nua. Gross floor space of proposed works (teach) 224.5 sqm (garáiste) 47.3 sqm.
Chun díon nua a chuir ar sean teachín cloiche atá an theana féin agus athrú are leagan amach an tí chomh maith le cead spás cónaithe a dheanamh ar an chéad úlár agus cead chun corás nua searachais agus aon oibreacha suíomh a bhaineann leis an tógáil chomh maith le bealach isteach nua chig an suíomh. Spás urláir comhlán na n-oibreacha beartaithe: 119.64 sqm. Spás urláir comhlán na hoibre atá le coinneail: 84.3 sqm
ChunTeach nua cónaithea thógáil chomh maith Garáiste nua agus le Córás searachais nua ag an seoladh thuas. Spás urláir comhlán na n-oibreacha beartaithe: 286.68 sqm & 54 sqm
The brief summarizes the pattern across all 372 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2361530The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief