Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 140 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention of a serviced dwelling with a septic tank and percolation area, a domestic shed and a garage on revised site boundaries, previously granted permission under P91/988
Alterations and extension to existing dwellinghouse new septic tank and percolation system along with all ancillary site works
DEMOLITION OF EXISTING DWELLING HOUSE, CONSTRUCTION OF A PROPOSED REPLACEMENT DWELLING HOUSE, DOMESTIC GARAGE, INSTALLATJION OF A WASTE WATER TREATMENT SYSTEM AND POLISHING FILTER AND ALL ANCILLARY WORKS.
CONSTRUCT A DWELLING HOUSE AND GARAGE AND TO INSTALL A PACKAGED WASTEWATER TREATMENT SYSTEM AND SOIL POLISHING FILTER, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES
RETENTION OF EXISTING DWELLING HOUSE, EXISTING UTILITY AND STORE, EXISTING SEPTIC TANK AND PERCOLATION SYSTEM, AND PERMISSION TO ERECT BOUNDARY FENCE TO THE REAR OF THE SITE TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES
Construction of a new residential dwelling house and effluent treatment system together with all ancillary site works and services
The brief summarizes the pattern across all 140 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25331The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief