Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 215 decisions within 5 km, 2 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the construction of a two-storey dwelling house, detached garage, entrance, boundary fence/wall, suitable on-site treatment system with polishing filter, and all ancillary site works
To construct a dwelling house, domestic garage, effluent treatment system, percolation area and all associated works. Gross floor space of proposed works: 247.50 sqm
To erect dwelling house, domestic garage, wastewater treatment system, percolation area and all associated services. Gross floor area of proposed works: 243sqm (dwelling house) and 58.9sqm (domestic garage)
To construct dwelling house, domestic garage, wastewater treatment system percolation area and all associated services. Gross floor space of proposed works: 248 sqm (house) & 50 sqm (garage)
For the construction of: 1. dwelling house and garage, 2. installation of a treatment system and percolation area, 3. to fill the site using inert materials (soil and stone) and all associated site works
For the construction of a dwelling house, domestic garage and on-site sewage treatment system. Gross floor space of proposed works: House - 275.6 sqm, Garage - 55 sqm
The brief summarizes the pattern across all 215 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561524The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief