CONSTRUCTION OF A DWELLING HOUSE, SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
CASTLEFORWARD DEMENSE , NEWTOWNCUNNINGHAM , LIFFORD PO
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
5% of nearby decided applications were refused. The preview found 164 nearby planning records within 5 km where a location match is available.
- Matched source
- 2561828
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
ERECTION OF A MEETING HALL WITH SEPTIC TANK AND PURAFLO SECONDARY WASTEWATER TREATMENT SYSTEM AND SOIL POLISHING FILTER ALONG WITH ASSOCIATED CAR PARKING AND ALL INFRASTRUCTURE AND SITE DEVELOPMENT WORKS
CONSTRUCTION OF AN EXTENSION TO AN EXISTING AGRICULTURAL SHED INCLUDING ALL ASSOCIATED SITE DEVELOPMENT WORKS
AGRICULTURAL SLATTED SHED WITH OPEN CUBICLES AND CONCRETE APRON LINKED TO EXISTING SHED IN LIEU OF PERMITTED EXTENSION TO EXISTING SHED PREVIOUSLY APPROVED UNDER PLANNING REF: 1351572 AND EXTENSION OF DURATION REF 18/51542
CHANGE OF USE AND PART RETENTION AND COMPLETION OF EXISTING COMMERCIAL UNIT TO FACILITATE A COMMERCIAL VEHICLE ROADWORTHINESS TEST CENTRE AND ALL ANCILLARY WORKS INCLUDING AN UPGRADE OF EXISTING SEPTIC TANK AND PERCOLATION AREA
CONSTRUCTION OF A COMMERCIAL UNIT FOR THE REPAIR OF ALL COMMERCIAL VEHICLES AS AN EXTENSION TO EXISTING FACILITY WITH CONNECTION TO EXISTING SEPTIC TANK AND PERCOLATION AREA
The brief summarizes the pattern across all 164 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 2561828The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief