Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 503 decisions within 5 km, 3 exact-site or onsite candidate records, and 20 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
20 structured nearby appeal records.
20 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a new serviced covered canopy to existing building previously granted under Pl. Ref: 2275
(1) change of use of the existing security depot (unit No. 5) to a light industrial wood processing unit.(2)for a new site boundary to unit No.5.The works will include (demolition of existing vehicle loading area including 2 No. offices, tea station and storage area. (b)The construction of a new office and sanitary facilities on ground floor level.(c) The construction of a new 38 sqm mezzanine floor to include a new canteen and storage area.(d) The provision of a new emergency exit door to the front façade of existing unit No.5.(e)To extend existing security fence to proposed new site boundary.(f)To erect new signage to the front façade of existing unit No.5. Previous PL.Ref No's (10/331 & 02/2145) refers. Gross floor space of proposed works 55 sqm.
For the construction of (i) commercial warehouse/vehicle repair garage building (1,383 sq.m), (ii) fuel storage & distribution depot including overground fuel storage tanks, associated above ground pipework, unloading & loading infrastructure, (iii) fuel sales forecourt including 1 No. underground fuel storage tank, fuel dispensing pumps and forecourt canopy, (iv) office/fuel sales building (50 sq.m), (v) all ancillary site features including, signage, boundary treatments, drainage systems, landscaping, car parking, connection to public services and associated site works. Gross Floor area of proposed works: 1,383 sq. m (Commercial warehouse/vehicle repair garage building) & 50 sq. m (office/fuel sales building)
To construct a light industrial unit (1032 m2) with ancillary office accommodation and all ancillary site works
Of existing window as constructed to rear of house. Previous planning reference: P17/1414. Gross floor space of work to be retained: 245.76 sqm. Gross floor space of any demolition: 32.12 sqm
To (1) extend their existing car dismantling facility, the area is to be used for the purpose of soring depolluted vehicles prior to their removal for recycling. (2) Construct an open plan, single storey building for the purpose of dismantling cars and storing recycled car parts. (3) Construct a weighbridge and a new vehicular site access including associated car parking. Permission for Retention is also sought for existing boundary site fencing. The above works include all associated site works and services. Gross floor area of proposed works 988 sqm.
The brief summarizes the pattern across all 503 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2561861The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief