Applications tied to the site
Partial coverage12 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
12 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 435 decisions within 5 km, 12 exact-site or onsite candidate records, and 21 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
12 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
12 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
21 structured nearby appeal records.
21 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Of canopy area over rear yard
Of canopy area over rear yard
To increase the occupancy of existing pre-school facility from the permitted occupancy of 28 children to 44 children in accordance with Tusla Guidelines, permission to increase floor area, permission for installing 3 additional toilets and a kitchen, and permission to retain existing additional floor space. Gross floor area of proposed works: 33.10 sqm. Gross floor area to be retained: 44.90 sqm.
To increase the occupancy of existing pre-school facility from the permitted occupancy of 28 children to 44 children in accordance with Tusla Guidelines, permission to increase floor area, permission for installing 3 additional toilets and a kitchen, and permission to retain existing additional floor space. Gross floor area to be retained 44.9 sqm, gross floor area of proposed works 33.1 sqm.
For the provision of temporary accommodation consisting of 1 No. 80sqm mainstream classroom together with associated facilities
For the erection of 1no. modular classroom, and all associated works and site works. Gross floor space of proposed works: 100.21 sqm
The brief summarizes the pattern across all 435 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660803The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief