Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 359 decisions within 5 km, 6 exact-site or onsite candidate records, and 41 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
41 structured nearby appeal records.
41 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECT A 8 YEAR PLANNING PERMISSION FOR A 3-4 STOREY MIXED-USE DEVELOPMENT (7926.79SQM G.F.A) COMPRISING (A) DEMOLITION OF EXISTING COMMERCIAL UNIT (B) CHANGE OF USE OF STOREROOMS AND OFFICES ANCILLARY TO EXISTING CONVENIENCE RETAIL STORE TO CONVENIENCE RETAIL USE (C) AMALGAMATION OF EXISTING DRY CLEANERS AND BUTCHERS TO 1 NO RETAIL UNIT (D) THE CONSTRUCTION OF A 2-STOREY EXTENSION ABOVE EXISTING PETROL STATION (E) 1 NO RESTAURANT (F) 8 NO ADDITIONAL RETAIL UNITS (G) 6 NO APARTMENTS (H) 6 NO OFFICES (I) 1 NO ANCHOR CONVENIENCE RETAIL UNIT INCLUDING THE SALE OF ALCOHOL FOR CONSUMPTION OFF THE PREMISES, WITH ASSOCIATED WAREHOUSE AND LOADING BAY (J) 1 NO LEISURE CENTRE WITH ASSOCIATED WAITING AREAS AND TERRACE (K) RELOCATION OF EXISTING CAR WASH TO SOUTH OF PETROL STATION FORECOURT (L) PUBLIC COURTYARD (M) 202 CAR PARKING SPACES OF WHICH 100 ARE LOCATED AT GROUND FLOOR LEVEL OF ANCHOR CONVENEINCE RETAIL UNIT (N) 24 BICYCLE STANDS (O) 4 NO ELEVATORS (P) 1 NO ACCESS RAMP TO BUILDING C (Q) 4 NO WASTE AREAS AND 2 NO ESB SUBSTATIONS (R) UPGRADE OF EXISTING ACCESS JUNCTIONS (S) STORM ATTENUATION TANK (T) LANDSCAPING, BOUNDARY TREATMENT AND SITE DEVELOPMENT WORKS ALL ON A SITE 1.34 HECTARES
FORM A NEW SHOP FRONT, WINDOW AND TO MODIFY AND UPGRAGE THE EXISTING SHOP FRONT, TO THE SOUTH WEST (FRONT) ELEVATION
Proposals include the demolition of the existing single storey flat roofed club house (213 SM) & the construction of a new Club House to replace same which will include to the eastern side of the entrance 4 no. dressing rooms, referee, physio, storage & plant rooms and to the western side of the entrance facilities including 2 no. community rooms, meeting room, office & toilet facilities. This structure will be single storey with an 'A' type roof, The overall floor area is 700 Sq. Meters with a ridge height of 6.9 meters, This building will be located along the same orientation of the existing dressing rooms. The existing boundary wall & gated entrance to Bóthair An Phoise & Bóthar na bPiarsach ( Dingle Relief Road ) is to be altered including the lowering of same with a view to opening up Páirc An Ághasaigh and the associated facilities. The goals & ball netting adjacent to the location of the club house will be revised to allow for proposed works. The existing Training Facilities to the N/W of the site will be realigned to provide better usage of this space and are to include flood lighting. A 3G area will also be created in this area, to facilitate winter training, which will be enclosed with metal fencing and flood light. To the rear of same there will be a drills area and ball wall. Spectator facilities will be improved through the creation of a standing terrace area to the eastern side of the Main Pitch. A single-storey structure is proposed adjacent to the Training Area which will include additional machinery storage facilities as well as accessible toilet facilities and kit storage (140SM) in this location. All services including Mains Water & Public Sewer connections are available at present and will serve the proposed new Club House and Toilet Facilities adjacent to Training Area. Vehicular access to Páirc An Ághasaigh for maintenance purposed will be via a ROW through Secret Heart University (SHU) grounds to the N/W of the site adjacent to Drills Area. The existing stone carving celebrating Tomás Ághas will be incorporated into new entrance lobby. Signage identifying the facility will be as presented in drawings submitted and all other signage notices will be in Irish. The proposed flood lighting to both training pitch & 3 G area has been designed by lighting specialist to provide the required lighting standards for training and playing football whilst ensuring the minimal overspill to adjoining properties from an energy efficient system.
(A) CEAD COIMÉAD A LORG CHUN NA LÍONTA LIATHRÓIDE AR CHÚL DHÁ BHÁIDE AGUS CUAILLÍ BÁIRE GAOLMHARA SAN AN ÁIT TRAENÁLA AGUS AN ÁIT TRAENÁLA A COIMÉAD AGUS (B) INA THEANNTA SIN, IS MIAN LINN CEAD IOMLAN PLEANÁLA A LORG CHUN ATHAILÍNIÚ AR AN ÁIT TRAENÁLA A DHÉANAMH, CUAILLÍ BÁIRE A THÓGAINT, UASGHRÁDÚ AN CÓRAS TUILSOILSIÚ SAN ÁIT TRAENÁLA, ATHLONNÚ A DHÉANAMH AR 6 CINN DE CHRAINN SOILSITHE TUILE 12 MÉADAR AR AIRED, 6 CINN DE CHRAINN SOILSITHE TUILE NUA 15 MÉADAR AR AIRDE A THÓGAINT, AGUS IAD GO LÉIR LE OIBREACHA COIMHDEACHA LÁTHREÁIN (A) RETAIN EXISTING REALIGNMENT OF TRAINING AREA, ASSOCIATED GOAL POSTS AND PROTECTIVE BALL NETTING TO SAME, (B) FULL PERMISSION TO COMPLETE TRAINING AREA REALIGNMENT INCLUDING THE ERECTION OF GOAL POSTS AND THE UPGRADING OF FLOODLIGHING SYSTEM IN TRAINING AREA, INCLUDING THE RELOCATION OF EXISTING 6 NO. 12 METER HIGH FLOODLIGHTING MASTS AND TO ERECT 6 NO. NEW 15 METER HIGH FLOODLIGHTING MASTS ALL WITH ASSOCIATED ANCILLARY SITE WORKS
ERECT A DETACHED STRUCTURE TO SERVE AS A TRAINING FACILITY (GYM) FOR MEMBERS ONLY
CEAD PLEANÁLA CHOIMEAD LE HAGHAIDH IONAD STÓRÁLA AON STÓR DO THREALAMH IMREOIRÍ ATÁ THÓGÁIL IN AICE AN SEASTÁN POIBLÍ AGUS (B) CEAD PLEANÁLA CHUN IONAD TRAENÁLA (GYM) A THÓGÁIL DO BHAILL AN CHLUB AMHÁIN. AR SON ÁR GCLIANT CUMANN LÚTHCHLEAS GAEL DAINGEAN UÍ CHÚIS. AG; PÁIRC AN ÁGHASAIGH BÓTHAIR AN PHOIST, FARRAN DAINGEAN UÍ CHÚIS.(A) RETENTION PERMISSION FOR AS CONSTRUCTED SINGLE STOREY DETACHED KIT STORE ADJACENT TO PUBLIC STAND, AND (B) FULL PERMISSION TO ERECT A DETACHED STRUCTURE TO SERVE AS A TRAINING FACILITY (GYM) FOR MEMBERS ONLY.
The brief summarizes the pattern across all 359 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 099757The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief