Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 90 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a forestry road and entrance onto the public road for the thinning/extraction of timber to existing forestry and associated site development works
Demolish existing extensions to front, side and rear of existing community centre and erect fully serviced two storey extension to front of existing building to form new entrance and meeting rooms, new single storey extension to side of building to form new toilet facilities and temporary gym, new two storey extension to rear of building to form new stage area, 4 no. changing rooms at ground floor and gym with associated changing rooms at first floor, and all associated alterations to existing plans and elevations,erect new canopy and turnstiles,erect new covered spectator stand to eastern side of existing pitch with associated siteworks, install new floodlighting to existing walking tracks, new carparking and all ancillary works
Erect 6 number 22m high floodlighting around the existing football pitch and 6 number 30m high floodlighting to the new football pitch. 2. To erect three number ball stop nets and all ancillary works
Construction of a front boundary wall together with all ancillary site works
Existing two storey type dwelling house with domestic garage, entrance, boundary walls / fences as currently constructed together with full planning permission for the proposed upgrade of the existing effluent treatment system with percolation area so as to comply with current EPA Code of Practice; Waste Water Treatment Systems Servicing Single Dwelling Houses 2009 and all ancillary site works
Existing Newly Installed Onsite Wastewater Treatment System With Polishing Filter And All Ancillary Works
The brief summarizes the pattern across all 90 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17103The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief