Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 320 decisions within 5 km, 6 exact-site or onsite candidate records, and 15 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
15 structured nearby appeal records.
15 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the following works: a) Construct new clubhouse to include, changing rooms, stores, gym, bar and meeting room, tea station, boiler room and spectator toilets, b) Construct extension to existing ball wall with adjoining covered indoor astroturf playing pitch, c)Machinery storage shed, d) Car and bus parking adjacent to proposed new clubhouse and works to internal access roadway, e) Connection to existing effluent treatment plant at Fr. Campion Place and all other associated site works. This application is for a 10 year permission
For modification of approved plan P.21474 to include only the reduction in floor area of the proposed single storey changing rooms and clubhouse structure and the associated modifications to building elevations. All siteworks will be in accordance with approved plan P.21474, which includes connection to existing wastewater treatment system at Fr. Campion Place as per approved plan Ref P.17105. The development and all associated siteworks are located
For development on its existing site at Danesfort, to include the construction of a single storey changing rooms and clubhouse structure, associated site works including connection to existing wastewater treatment system at Fr Campion Place as per approved plan Ref: P.17105. The development will also include external lighting, planting to site boundaries, construction of masonry walls to boundaries with adjoining properties, lighting of perimeter walkways and footpaths, and includes fencing, netting and flood lighting of proposed all weather playing pitch, and all associated siteworks
To amend Condition No. 2 of granted planning reference 17/105 which requested a landscaping buffer to be provided to the eastern boundary with adjacent properties. We propose to amend this condition to provide a 2.4M high masonry wall in lieu of landscaping buffer
Of the existing 58 sqm single storey extension to the north of the existing school building comprising of 1 no. Special Education Teacher Support Room with toilet accommodation and link corridor together with all associated site works
The development will consist of the construction of a new single storey classroom extension to the rear of the school building, provision of a temporary construction access roadway, and upgrade of the existing on-site wastewater treatment system including polishing filter together with all associated site & ancillary works
The brief summarizes the pattern across all 320 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17105The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief