Executive snapshot
1% of nearby decided applications were refused. The site check found 107 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Existing recessed entrance with gates
A 60m x 50m Floodlight Astroturf pitch, warm up area and associated site works including 2.5m high netting on top of 2.4m high perimeter fence and a new 4m wide gateway from existing playing pitch
(a) erection of flood lighting on playing field in the form of 6 no. 15m high lighting poles and (b) erection of a ball stop net in training area and associated site works
An extension to existing production facility building and the relocation of two precast holding tanks and percolation area previously granted ref. 18/310 and all associated works
Hardcore existing green field and concrete pad, extension to existing production building and two silo's to the north of existing production building and one silo to the south of existing production building, and permission for a new carpark and entrance for a one way traffic system and all associated works
Construction of 3 no. buildings for production and storage purposes ancillary to existing manufacturing facility and all associated works
The brief summarizes the pattern across all 107 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 171109The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief