Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 96 decisions within 5 km, 7 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To erect single storey detached boathouse facility with associated training and changing rooms together with Oakstown waste water treatment system and associated siteworks. This application relates to a proposed development adjoining a Special Protection Area. A Natura Impact statement will be submitted to the planning authority with the application. Significant further information and revised plans have been submitted
Single storey detached boathouse facility and associated siteworks. This application relates to a proposed development adjoining a Special Protection Area. An Ecological Impact Assessment Report has been prepared in respect of the proposed development and accompany this planning application
For temporary storage of steel container for canoes and boating equipment
To retain temporary storage of steel container for canoes and boating equipment, planning ref no. 16/4 which has expired
For construction of a tourist campsite comprising: (a) vehicular access from existing laneway, (b) passing areas on existing laneway and works associated with achieving requisite sight distances at laneway junction with public road, (c) parking area for cars and camper vans, (d) pathways leading to tent, yurt and shepherds hut grassed camping area, (e) a single storey winter storage building for yurts and tents, (f) a single storey building incorporating toilets, showers and laundry facilities, (g) installation of a sewage treatment system, (h) formation of a floating marina with disabled access and (i) landscaping boundary fencing and all other ancillary works. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application. Significant further information/revised plans including a Natura Impact Statement has been submitted.
For construction of a tourist campsite comprising: (a) vehicular access from existing laneway (b) passing areas on existing laneway (c) parking area for cars and camper vans (d) pathways leading to tent, yurt and shepherds hut grassed camping area (e) a single storey winter storage building for yurts and tents (f) a single storey building incorporating toilets, showers and laundry facilities (g) installation of a sewage treatment system (h) formation of a floating marina with disabled access (I) landscaping boundary fencing and all other ancillary works
The brief summarizes the pattern across all 96 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17112The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief