Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 130 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Consists of (1) Construction of a farm building for the housing of livestock including a slatted area over an underground effluent storage tank, and (2) Construction of a silage pit base, all completed with associated siteworks and for the purpose of agriculture. Gross floor space of proposed works 259.00sqm.
For: (a) Conservation and protection of all existing viable trees and woodland areas and the natural environment as a fundamental objective of the development and the extensive planting of additional native tree species, as well as other planting proposals in keeping with biodiversity objectives, the design heritage of the estate and the proposed development. A small number of minor and diseased trees are proposed for removal to accommodate safe site circulation. (b) Construction of a visitor centre comprising a restaurant, café and gift shop, which will be fully universally accessible with interpretation and visitor servicing. (c) The provision of 10 no. timber shepherd's huts raised above ground levels, to conserve existing ground conditions and preserve through routes for movement of wildlife. The huts, arranged in a cluster, are confined to the north eastern portion of the lands, carefully respond to their specific site context, respecting existing woodlands and topographical conditions. The provision of an external guest communal area. (d) Provision of 2 no. butterfly domes, a garden dome with internal water feature, a media dome, vivarium and mining experience to provide interactive immersive experiences, enhancing awareness and promoting environmental stewardship. (e) Construction of a playground and petting farm area. (f) Provision of sensitively designed landscaped areas, including paths and paved terraces, native, ornamental and screen planting; seated areas; timber cycle shelters and pergolas and water features. Resurfacing of existing pathways with minor extensions and realignments to avoid tree canopy overhangs. (g) Sustainable energy sources with the use of roof-mounted renewable solar photovoltaic panels and plant. (h) Provision of an entrance gate to provide vehicular access from the R356, with related walls and signage, demolition of existing boundary wall and new hedgerow with post and rail fence to define boundary. (i) Construction of 1 no. permeable asphalt surfaced car park providing a total of 250 no. car parking spaces including 18 no. designated parking spaces and 6 no. bus parking spaces and a separate recreational vehicle (RV) area. The majority of the parking bays will be gravel and the designated parking bays will be asphalt. The car parking provision includes for the future installation of EV charging facilities for 20% of the car parking spaces. (j) Provision of public lighting/foul sewer drainage & all site works. (NIS)
For a change in house design from that previously approved under planning ref no. 23/422 for a dwelling, garage, wastewater treatment unit with percolation area and site entrance and all associated site works. Gross floor space of proposed works: (House) 145 sqm & (Garage) 60 sqm
On the grant of outline planning permission (previously approved under pl. ref. no. 20/619) for the following development: (a) construction of a new dwelling, (b) construction of a domestic garage, (c) wastewater treatment system with percolation area, (d) new site entrance & all associated site works
For the following development: (a) Construction of a new dwelling (b) construction of a domestic garage (c) wastewater treatment system with percolation area (d) new site entrance and all associated site works.
For the following development: (a) construction of a new dwelling (b) construction of a domestic garage (c) wastewater treatment system with percolation area (d) new site entrance and all associated site works.
The brief summarizes the pattern across all 130 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 171161The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.