Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 257 decisions within 5 km, 5 exact-site or onsite candidate records, and 26 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
26 structured nearby appeal records.
26 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(A) CONSTRUCT PART SINGLE STOREY, PART TWO STOREY DWELLING HOUSE (B) CONNECTION TO PUBLIC FOUL AND STORM WATER SEWERS (C) NEW VEHICULAR ENTRANCE AND (D) ALL ANCILLARY SITE WORKS
RETAIN AND COMPLETE A DWELLING HOUSE ON STIE
(A) CONSTRUCT A TWO STOREY DWELLING HOUSE WITH ATTIC ACCOMMODATION, (B) NEW VEHICULAR ENTRANCE WITH FRONT BOUINDARY WALL AND GENERAL SITE LANDSCAPING AND (C) INCLUDING NEW CONNECTIONS TO THE PUBLIC SEWER AND STORM WATER SYSTEMS AND ALL ASSOCIATED SITE WORKS
To a construct a house
CONSTRUCT A TWO STOREY DWELLING HOUSE COMPLETE WITH NEW VEHICULAR ENTRANCE, CONNECTIONS TO FOUL AND STORM WATER SEWERS AND ANCILLARY SITE WORKS
(A) CONSTRUCT A NEW ACCESS ROAD, FOOTPATHS AND ASSOCIATED LANDSCAPING (B)NEW CONNECTIONS TO PUBLIC SEWER AND WATERMAINS, (C) PROVISION OF SHARED AMENITY SPACE, (D) AND ALL ASSOCIATED SITE WORKS AND (E) OUTLINE PERMISSION FOR 5 DWELLING HOUSE SITES
The brief summarizes the pattern across all 257 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 171259The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief