Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 252 decisions within 5 km, 2 exact-site or onsite candidate records, and 15 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Wicklow County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Wicklow County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Wicklow County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched3 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 matched15 structured nearby appeal records.
15 matchedCitations are current-dated and carry policy name, section, page and source URL from the Wicklow County Council development plan.
2 matchedOpen preview
Open preview
Cattle shed with slatted underground effluent storage tank and all associated site works
Demolition of existing rear extension, demolition of existing side extension, demolition of existing chimneys, demolition of 2 existing sheds, removal of existing mobile home, blocking up existing window to front elevation, construction of new rear extension, internal layout changes, new windows to front elevation, new domestic garage, removal of existing septic tank, new wastewater treatment unit & soil polishing filter, and associate works
Construction of a two storey extension to the side of my existing dwelling house, upgrade existing wastewater treatment system and all associated site works
Construction of a part two storey, part single storey dwelling, attached garage, new site entrance, wastewater treatment system to current EPA standards, private well and all ancillary site works
1) retention for building I used for storage 2) retention for building D used for timber product manufacturing 3) retention for change of use for building E from timber storage to concrete product production facility & retention for cement silo 4) retention for extension to the rear for building G 5) retention for extensions to building K to the front & side elevation also retention for existing roof 6) permission for demolition of part of building H office space & permission to construct replacement office space 7) permission for demolition of building J 8) permission to erect building L(2) to be used for storage 9) permission to upgrade existing effluent treatment system to comply with current EPA requirements 10) permission for new road layout drainage car parking facilities and associated works
Planning permission is sought for the construction of 3no. One & Half Storey Dwellings, connections to mains sewerage & water services, 2no. new entrances and all associated site development works at Shillelagh Road, Tullow, Co, Carlow.
The brief summarizes the pattern across all 252 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 171265The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief