Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 155 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) CONSTRUCT A NEW DWELLING HOUSE (2) CONSTRUCT A SITE ACCESS ROAD INCLUDING ALL ASSOCIATED ANCILLARY SITE WORKS (3) INSTALL A NEW SECONDARY WASTEWATER TREATMENT SYSTEM. THE PROPOSED INSTALLATION WILL INCLUDE A SEPTIC TANK AND PERCOLATION AREA
CONSTRUCT NEW DWELLING HOUSE AND DOMESTIC GARAGE SERVED BY SEPTIC TANK AND PERCOLATION AREA
(1) EXTEND A CUBICLE HOUSE, (2) CONSTRUCT A MILKING COMPLEX, (3) CONSTRUCT A CALF HOUSE AND (4) EXTEND AN UNDERGROUND SLURRY TANK ON THEIR FARM
CONSTRUCT A ONE AND A HALF STOREY DWELLING, SERVICED BY A MECHANICAL TREATMENT UNIT, INTERMITTENT FILTER AND POLISHING FILTER, TO CONSTRUCT A DOMESTIC GARAGE, WITH ALL ASSOCIATED SITE WORKS
ALTER, REFURBISH AND EXTEND THEIR DWELLING COMPLETE WITH ASSOCIATED SITE WORKS INCLUDING THE CLOSING OF THE EXISTING SITE ENTRANCE AND THE FORMING A NEW SHARED SITE ENTRANCE AND ALSO FOR A NEW MECHANICAL WASTE WATER TREATMENT UNIT AND POLISHING FILTER
CONSTRUCT A BELLMOUTH FOREST ROAD ENTRANCE, FOR TRUCKS TO ACCESS FORESTRY PLANTATIONS AND ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 155 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 171306The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief