Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 236 decisions within 5 km, 7 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched1 of 2 layers are loaded for Sligo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Sligo County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Sligo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedNo current-dated citation is loaded for Sligo County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For development consisting of the construction of a single storey extension to existing dwellinghouse, and associated works
Development consisting of construction of single storey bedroom and shower extension to the gable
A single and two-story classroom extensions with ancillary accommodations and associated site work at Scoil Mhuire agus Íosaf, church view, Collooney, Co. Sligo.
Development consisting of alterations and a two storey extension to Scoil Mhuire agus Iosaf. The proposed extension will consist of 6 classrooms, an ASD classroom and ancillary accommodation. Floor area of extension will be 937 sq m. Permission is also sought for a new staff car parking area to the rear of the proposed extension and associated site works. 4 No existing prefabricated classrooms will be removed following completion of the extension.
Development consisting of retention of 2 No existing prefabricated classrooms, floor area 72 sq m each and permission for 2 No temporary prefabricated classrooms, floor area 80 sq m each and associated site works.
Development consisting of renovation and extension of dwellinghouse, raising the roof level by 1 metre and incorporating velux windows to front and rear elevations
The brief summarizes the pattern across all 236 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 17383The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief