Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 581 decisions within 5 km, 6 exact-site or onsite candidate records, and 35 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
35 structured nearby appeal records.
35 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Of development from previously granted planning reference no.s 17/467 & 15/142 to consist of: (1) retention of alterations to office extension (2) retention of ESB substation and associated plant (3) retention of Rainwater harvesting tanks and associated infrastructure (4) retention of alterations to parking areas, landscaping and all associated and ancillary works
To erect fully serviced 2 storey extension to existing office and storage unit and also erect storage tank and all associated works. Significant further information and revised plans have been submitted
To erect a fully serviced storage extension to side of existing waste handling unit (waste permit WFP-CN-21-0003-01 relates to this facility) and all ancillary site works
To alter location of previously approved attenuation tank (Pl. Ref. 11/326) and all associated works
To erect fully serviced vehicle service workshop, extended yard, HGV parking and extended staff park with boundary treatments and all ancillary site works. A Natura Impact Statement, as required under Article 6 of the Habitats Directive, will be submitted in respect of this application
For: 1) Alterations to the Waste Processing Building, including: 1.1) Repositioning of the southernmost loading door at the front of the building by one bay to the left/southwest. 1.2) Construction of a below floor level outgoing loading ramp for the southernmost loading door measuring 17m (L) x 4.5m (B) x 2.15m (D). 1.3) Construction of a below floor level skip intake pit within the eastern corner of the building measuring 12.8m (L) x 12.5m (B) x 3.8m (D). 2) Extension of the Front Yard southeast by 15m. 3) Repositioning of the Site Entrance 5m south. 4) Repositioning of the Weighbridges and Weighbridge Kiosk east-northeast by up to 43m. Reconfiguration of the Weighbridge Kiosk. 5) Construction of an Entrance Ramp measuring 44.4m (L) x 14.1m (B) x 2.4m (H) from the Site Entrance to the Weighbridges. 6) Construction of a Retaining Wall measuring 44.4m (L) x 0.35m (B) x 2.7m (H) between the Front Yard and Entrance Ramp. 7) Repositioning and reconfiguration of the Administration and Welfare Facility and car parking areas. 8) Construction of a Storage Building measuring 3.0m (L) x 2.9m (B) x 2.5m (H). 9) Repositioning of the Lorry Parking Area from south boundary to the east boundary and increase in parking spaces from 9 No. to 10 No. 10) Repositioning of the Odour Control Unit 25m northeast and reconfiguration of the unit. 11) Installation of a Baler and construction of Shed Over measuring 36.2m (L) x 8.5m (B) x 13.5m (H). 12) Recontouring of an embankment area to the north of Rear Storage Yard to be level with the Rear Storage Yard covering an area of 730m². 13) Construction of a Firewater Storage Tank measuring 3m (radius) x 8.0m (H) and Pump Building measuring 12.2m (L) x 2.4m (B) x 3m (H) located within the recontoured area. 14) Repositioning of approximately 40m of northwest boundary fence by 8m inwards towards the centre of the site. 15) Repositioning of the Substation from within Waste Processing Building to 13m west outside of the building. The Substation measures 11.2m (L) x 4.4m (B) x 3.0m (H). 16) Installation of 2 No. Generators. 17) Repositioning of 2 No. diesel tanks from northeastern boundary of the Waste Processing Building to 10m west of the building. 18) Additional area of landscaping along the western boundary of the site measuring 600m². This application is accompanied by an EIA Screening Report, AA Screening Report, Planning and Environmental Report and Drawings
The brief summarizes the pattern across all 581 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17467The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief