Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 182 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(A) construct an extension to existing warehouse facility along with the installation of a doc leveller access and associate ancillary room, (B) extend canopy to front elevation of existing warehouse, (C) extend existing yard, erect boundary walls with connection to existing septic tank and all associated site works
Change of house type from previously approved under planning permission 19/788 and for planning permission for the construction of a domestic garage and all ancillary site works
Construction of a single storey dwelling house, entrance, driveway, wastewater treatment unit, polishing filter and all ancillary site works
The construction of an 18 metre high free standing communications structure with its associated antennae, communication dishes, ground equipment and all associated site development works. The development will form part of Eircom Ltd. existing telecommunications and broadband network
The demolition of existing deralict house and the construction of a new dwelling house, mechanical aeration unit and soil polishing filter, vehicular entrance and carry out all associated ancillary site works
Construction of a new farm roadway using concrete, stone, blocks and tiles from the construction industry. A certification of registration (COA) will be applied to Limerick City and County Council for this activity
The brief summarizes the pattern across all 182 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17513The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.