Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 209 decisions within 5 km, 2 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
New pedestrian access, associated site works and alterations to elevation to residential apartment
To 1)partially demolish and convert existing community centre (formerly Erne Ballroom / Palais and protected structure) to 2 no. one-bedroom apartments retaining the front façade of existing building, 2) erect 3 no. two-storey two-bedroom terraced houses, 3) erect 2 no. two-bedroom terraced bungalows (7 units in total) with connection to all public services and all associated site works. These works are to be carried out to protected structure CV44018 Erne Ballroom. Significant further information and revised plans have been submitted
To retain 2 no extended basements & conversion to 2 no. 2 bed apartments, alterations to elevations, site boundaries & all ancillary works
For development consisting of detached two storey dwelling and ancillary site development works. Significant further information and revised plans have been submitted
Of alterations to floor plans, elevations and alterations to site layout of previously approved planning permission and all associated ancillary works.
To demolish existing unused pumping station and erect fully serviced single storey public amenity unit to include public shower/toilet facilities, plant room and bin enclosure with connection to public services and all ancillary works. Significant further information and revised plans have been submitted
The brief summarizes the pattern across all 209 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 17560The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief